Our contract programme shows a completion date for Sigmat of 12th December 2017, you have completed 10 weeks earlier. Well done from the client team.” Sigmat have done a fantastic task, demonstrated great levels of management, cooperation and coordination and completed works ahead of programme

Jonathan Greenhalgh, Director, Green Project Management Ltd

This was our first project with Sigmat and I can say that it was a successful one. Their communication throughout was extremely positive and honest. The Sigmat Senior Site Manager and their 'holiday cover' Site Manager were not only professional but exemplary in work ethic and manner. The promises made by both during site and progress meetings were met. As for programme, I can report that this was achieved by Sigmat and overall, Forrest were very impressed with the system and hope to repeat the experience with future suitable projects

Sean Connor, Projects Director, Forrest
Eastbank

Since this was our first experience of building with light gauge steel the speed of construction took us all by surprise. This is a ‘great piece of kit’ that went up well, with the Sigmat team working in partnership with other trades on site. I’d be more than happy to construct in this way in the future.

Alan Richards, Construction Director, McCarthy & Stone
Harbour Lights

We were impressed by the professionalism of Sigmat throughout the project and their proactive approach whilst working with the design team. They responded to the challenging curves in the design and the bespoke frame manufacture and installation went without a hitch.

Matt Russell, Senior Site Manager, Tolent Construction Ltd
The Sands

The expertise of Sigmat in delivering an 11-storey light gauge steel solution was a key component in the success of this landmark project. We were delighted by the practical and time-saving advantages of using a light gauge frame.

Andy McDonough, Deputy Managing Director (Student Accommodation) and Commercial Director, Watkin Jones Group
iQ Bristol

The efficiency and speed of Sigmat was an important factor in delivering our high profile hotel close to Terminal 5. We were impressed at the design, manufacturing and installation stages and by the Sigmat team’s attention to detail.

Les Nicholls, Regional Director, John Sisk Group
T5 Travelodge

Both the design and the on-site professionalism of Sigmat came to the fore in this project. We are delighted with the innovative design and the unique combination of light gauge and structural steel which makes the building work as a unified whole.

Sean Connor, Projects Director, Forrest
Drayton Manor
London Road
Marionville
Talbot House

We found that Sigmat had all the experience we were looking for. Their expertise in frame design, manufacture and installation resulted in a 20-week programme for frame installation. This gave our project a good head start and created a positive momentum which we aim to maintain until the completion of Phase 1 in Autumn 2011.

Andy McDonough, Deputy Managing Director (Student Accommodation) and Commercial Director, Watkin Jones Group.
Collegelands
Collegelands
Corporation Street
Eastbank
Square Hale Barns

Our established relationship with Sigmat meant we could put an accelerated programme in place and we had every confidence in them to install the frame within the 20 week timeline. The Sigmat team overcame problems with ground levels and were able to deliver a quality solution on time.

Andy McDonough, Deputy Managing Director (Student Accommodation) and Commercial Director, Watkin Jones Group.
Thurso Street
Thurso Street
Tara House
Gateway

Sigmat were chosen to design, manufacture and install their light gauge steel framing solution for this student accommodation project in the heart of Sheffield. This was because of their proven expertise in this field, a very short programme and a great value for money solution. Our Site Manager said that the speed of erection, combined with the efficiency of the Sigmat team, meant that this was a great project to manage and one that he personally would like to repeat. I’d have to agree with him there. We look forward to working closely with Sigmat in the near future and would not hesitate to recommend their light gauge steel building superstructure solution.

Sean Connor, Projects Director, Forrest
Pearl Works

The team have been very impressed with the speed and ease of delivery. This is reflected in the very high degree of organisation, communication and professionalism of all involved, from the concept to the delivery. Everyone from Sigmat have been approachable and flexible and worked with the site team to make this a successful build. We would all like to congratulate the site team for all the efforts that were brought to bear to maintain a tight programme on a very confined site.

Les Nicholls, Regional Director, John Sisk Group

Our established relationship with Sigmat meant we could put an accelerated programme in place and we had every confidence in them to install the frame within the 20 week timeline. The Sigmat team overcame problems with ground levels and were able to deliver a quality solution on time.

Andy McDonough, Deputy Managing Director (Student Accommodation) and Commercial Director, Watkin Jones Group.